As an established and trusted local supplier, Shufflebottom was commissioned by Morgan Sindall Construction to supply the structural steel for the recently completed £12 million Merthyr Tydfil sustainable bus interchange, which has set the benchmark for green transport infrastructure in Wales. This high-profile project comprises a two-storey steel-framed building measuring 1,130 sq. metres with a zinc roof designed to celebrate the town’s ironwork heritage.


Building specifications

  • Structural-steel supplied to Engineer’s design and specification

  • 135 tonnes of hot-rolled steel

  • 0.5 tonnes of cold-rolled steel